MAIN CONTENT
A factory designed for industrial scale
King Philippe inaugurated the facility on November 24, 2026. According to CNBC, the oval-shaped building covers 20,000 square metres and could become the world’s third-largest satellite manufacturing site by annual capacity. Employees are expected to move in during January 2027. AFP, cited by CNBC, reported that production is scheduled to start by the end of 2028. These dates underline the distinction between opening a building and achieving full industrial output.
The September 10 announcement from Aerospacelab describes a €2.4 billion assignment to design, manufacture and deliver 264 low-Earth-orbit satellite platforms as integrated spacecraft. The company is due to adopt the name Ectro on November 30. A contract of this size can help justify investment in specialist equipment, training and supplier relationships. It does not guarantee that every delivery will meet its original timetable.
IRIS² puts secure connectivity first
The European Commission and the SpaceRISE consortium signed an implementation agreement on August 7, 2026, expanding the main constellation from 282 to 348 satellites. The Commission says this change increases planned secure communications capacity for governments by 60%.

















