MAIN CONTENT
Ping Che 2,000-cubic-metre storage tank and robotic river dredging
In a Sunday, November 22, 2026 blog post citing engineer Joe Lee Ho-ting, Secretary for Development Bernadette Linn Hon-ho said the Drainage Services Department completed a stormwater storage tank in Ping Che in late October with a capacity of 2,000 cubic metres (70,629 cubic feet) — roughly the volume of a standard swimming pool. Fitted with an intercepting channel and four drainage pumps, the tank diverts and holds excess water when levels rise in tributaries of the Ping Yuen River.
The facility followed heavy, concentrated rainstorms in the northern New Territories during May and June that pushed upper reaches and tributaries over their banks, flooding nearby roads and low-lying villages; the department also deployed robots to carry out immediate dredging and widening works along the river.
"Extreme weather is becoming increasingly frequent, posing immense challenges to flood prevention work; the Development Bureau actively encourages works departments to leverage innovative thinking and cutting-edge technology to enhance the city's resilience against climate change." Bernadette Linn Hon-ho















