A second standard-gauge track
According to a document posted on Russia’s official legislative portal on Monday, Putin signed a law ratifying the deal reached with Beijing during his visit to China in May. The two sides will jointly build a new track along the cross-border railway linking Zabaikalsk and Manzhouli.
Crucially, the track will use China’s 1,435mm gauge rather than Russia’s wider 1,520mm gauge. Russian media report that construction on the Russian side has begun and is expected to be completed by the end of 2026, with the Chinese section due in early 2027.
Easing a border bottleneck
Freight trains currently use a single 1,435mm track at the Manzhouli-Zabaikalsk crossing, which handles more than 60% of China-Russia rail freight and a significant share of Europe-bound cargo. Trains in opposite directions take turns, creating periodic bottlenecks. Expected benefits of the new track include:
- Raising annual capacity at Zabaikalsk to 39 million tonnes by 2030, up 11 million tonnes from current levels.
- Shorter waiting times and faster, more reliable services along the eastern corridor.
- More stable two-way shipments of commodities, machinery, electrical products, consumer goods and e-commerce cargo.














