A familiar path, open again
For many residents, the towpath beside the Thames is more than a route into town. It is a place for morning runs, quiet walks and watching rowers glide along the river. Its closure over the summer and autumn was keenly felt by those who rely on it every day.
Now the barriers have come down. The river wall repairs are finished, and pedestrians can once more follow the water between the Isis Farmhouse pub and Donnington Bridge.
The successful completion of the emergency repairs safeguards this section of the towpath.
Why the work could not wait
The repairs had been scheduled for 2027, but routine inspections changed the timetable. According to the council, the wall was deteriorating more quickly than anticipated, and cracks in the structure were growing wider.

















