MAIN STORY
Transplanting the Permian model
At El Trapial, the distance between the field and an efficient supply chain may matter as much as the distance between wells. Chevron wants to replicate a defining feature of the American shale boom: drilling wells in sequence and maintaining enough completed drilling inventory for hydraulic-fracturing crews to work continuously. Eliminating idle periods can lift productivity even without new geological discoveries.
The site requires a charter flight of roughly 45 minutes from Neuquén city. Workers live in a camp where older accommodation is being replaced, while transport and industrial services must expand along with the rig count. This is a reminder that a shale development is not simply a hole in the ground. It is a durable system of labor, equipment, logistics and maintenance.
Chevron fully owns and operates El Trapial. It also holds 50% interests in Loma Campana, a project producing roughly 110,000 barrels of oil equivalent daily, and in Narambuena, which has yet to begin production; Argentina’s YPF operates those two projects. Total field output should not be confused with Chevron’s equity-attributable production.
















