From Sole Bidder Back to Square One
According to The Korea Herald, Hanwha Ocean was named preferred bidder in September to build a 4,000-ton frigate and provide logistics support. It became the sole bidder after passing the technical evaluation, beating several rivals:
- South Korea's HD Hyundai Heavy Industries;
- Spain's Navantia;
- Singapore's ST Engineering;
- Turkey's TAIS and ASFAT.
No contract, however, was signed before the tender was cancelled. Hanwha Ocean confirmed the news in a regulatory filing.
A Gap in the Tender Documents
Thailand's public procurement rules require the navy to set a minimum value for bidders' previous shipbuilding contracts, capped at half the project budget – no more than about 8.5 billion baht for a 17 billion baht project. The navy only required bidders to have completed a frigate construction contract, without specifying the minimum value.















