The Governor’s Firm Refusal
According to Jiji Press, at a news conference in Mito on Friday, October 2, Kazuhiko Oigawa said he had no intention of approving a preliminary survey and ruled out Ibaraki hosting a disposal facility for high-level radioactive waste. He stressed that his position would not change.
The statement came after Hitachiomiya Mayor Sadayuki Suzuki announced on Wednesday that the city would accept a literature survey. The move by the mountainous city in northern Ibaraki drew attention, as it is one of very few municipalities willing to enter this highly sensitive selection process.
“My position will not change.” — Kazuhiko Oigawa
A Three-Stage Process and a Prefectural Bottleneck
Japan selects a final disposal site through three stages spanning about 20 years:
- A literature survey, lasting about two years, based on existing geological data and records without drilling.
- A preliminary survey, lasting about four years, involving on-site drilling and requiring the prefectural governor’s consent.
- A detailed survey, lasting about 14 years, in which an underground research facility is built for in-depth geological assessment.

















