The robotic arm enters the No. 2 reactor
Tepco has inserted a robotic arm into the containment vessel of the No. 2 reactor at the Fukushima No. 1 plant in Fukushima Prefecture to better understand conditions inside before removing some nuclear fuel debris on a trial basis. The work is expected to take about six months.
The opening in the containment vessel had been used to remove equipment for inserting and withdrawing control rods, which control the nuclear fission reaction.
Rails installed down to the bottom of the reactor pressure vessel are believed to be hindering investigations.

















